Excavations and earthworks

Excavation and earthworks as part of various infrastructure and power projects, as well as according to client orders. The works include mechanical and manual excavations, preparation and leveling of the terrain, making channels for electrical installations, laying protective pipes and preparing the foundations..

Off-grid solar power plant Pag

Implementation of an autonomous solar system on the island of Pag for the needs of a facility without a connection to the public grid. The system consists of 4 solar modules with a power of 405 W (total 1.62 kW), a 3 kW inverter and two Li-Ion batteries with a capacity of 12.8V / 200Ah..

Electrical installations

Execution of complete electrical installations in a new residential building, including the distribution of electricity throughout the building, installation of distribution cabinets, installation of cables for lighting, sockets and consumers, as well as the installation of a grounding and protection system..

Optics Croatian Telecom

Implementation of advanced network optics to improve the infrastructure of Croatian Telecom. The project included the installation and configuration of high-speed optical connections to ensure stable and fast connectivity to users throughout Croatia..

Hypercharger for Iveco

Installation of ultra-fast Hypercharger charging stations for electric vehicles within the Iveco logistics network. The project included complete technical integration and connection to the company’s existing infrastructure.

Garbsen Hypercharger

Installation of a Hypercharger station in Garbsen to support local electro-mobility. The project included electrical work, installation of the charger and testing of the system for public use..

Total Energies Brunn Hypercharger

Commissioning of the Hypercharger charging station for Total Energies in Brunn. The project included the installation of the charging station control cabinet, wiring and commissioning, final technical checks, system configuration and monitoring of the correct operation of the charger..

Total Energies Aurach Hypercharger

Final phase of integration of the Hypercharger charging station in Aurach for Total Energies. The role included functionality control. The project included installation of the charging station control cabinets, wiring and commissioning, as well as testing of safety systems and ensuring stable operation..

Total Energies Ungerhausen Hypercharger

Control and commissioning of the Hypercharger charging station in Ungerhausen. The project included the installation of the charging station control cabinet, wiring and commissioning, technical validation of the system, test charges and verification of all functionalities before opening to users..

VW project for electric tractor charging stations

A specialized project for Volkswagen, focused on the installation of charging stations for electric tractors. It included the development of a technical solution adapted to the needs of the agricultural industry and testing the functionality in the field.

PAUL heat sensors in Germany

Extensive installation of PAUL temperature monitoring sensors in various facilities across Germany. The project included mounting, calibration and connection of the sensors to a monitoring system for real-time monitoring..

Merbag Vienna Mercedes-Benz – EMS system

Installation and configuration of the Energy Management System (EMS) for the solar system in the Mercedes-Benz showroom in Vienna. The project enabled efficient management of the production and consumption of solar energy, with detailed monitoring of energy flows and optimization of consumption..